Design
Architek was challenged by the architect on this multiple level, multiple green roof project to install a water retaining green roof system that did not require irrigation. We used a Zinco FD 25 water retention build-up for these green roofs.
Installation
Architek installed the a number of green roofs on multiple levels and also managed the paver hard-scaping scope directly with general contractor, Stuart Olson. Due to the steep sloped location of the college campus and hidden courtyard, a 200-ton crane was used to hoist materials needed.
Maintenance
Architek has had a maintenance contract at Douglas College for 12 years and the green roofs are thriving.